Noetic Logo
Noetic Site Diligence Report showing regulatory constraints and findings

Site Diligence Reports

Know what you’re buying before you commit.

Zoning interpretations, deed restrictions, density bonus programs, environmental constraints, and entitlement requirements — researched against the actual local code and cited to the source. In hours, not weeks.

The most expensive surprises happen before the first drawing.

Developers evaluate 5-10 sites for every one they pursue. But understanding the regulatory constraints on any single site requires digging through zoning codes, county clerk records, GIS overlays, utility databases, and environmental regulations. Today, that research takes weeks and costs thousands.

$5-15K
Traditional Feasibility Study
Per site, before you know if it works
2-4
Weeks to Complete
40-50% is manual data gathering
5-10
Sites Evaluated per Deal
Most won’t pencil — but you pay to find out

Every constraint on your site. Sourced and cited.

A Site Diligence Report pulls from 10+ public data sources and interprets the results against the jurisdiction’s actual regulatory code. Every finding cites its source — tax records, GIS, FEMA, county clerk records, utility databases — so you can verify anything.

Zoning & Entitlements

  • Base zoning with dimensional standards (height, setbacks, FAR, coverage)
  • Overlay district identification and impact
  • Compatibility standard triggers and height step-downs
  • Permitted, conditional, and prohibited uses
  • Non-conforming use classification

Recorded Documents

  • Deed restrictions and private covenants
  • Easements with widths, types, and release status
  • Neighbor agreements and setback obligations
  • Plat notes that override zoning
  • Development restrictions from prior approvals

Environmental & Drainage

  • Floodplain designation and base flood elevation
  • Water quality zone proximity and setbacks
  • Local environmental features (aquifer zones, wetlands, critical habitats)
  • Impervious cover limits by watershed
  • Detention and water quality requirements

Transportation & Utilities

  • Street classification and right-of-way requirements
  • Roadway data (traffic counts, lanes, speed, functional classification)
  • Water and wastewater service availability
  • Electrical infrastructure requirements
  • Driveway placement constraints

Trees & Environmental Features

  • Protected and specimen tree identification
  • Critical environmental features
  • Environmental inventory and assessment requirements
  • Tree survey age and update needs

Fire Protection

  • Fire flow requirements
  • Access and apparatus clearance
  • Sprinkler system triggers
  • High-rise threshold implications

Take advantage of every opportunity.

Most cities have dozens of incentive programs — density bonuses, fee waivers, tax credits, expedited review tracks. A Noetic diligence report identifies which programs your site qualifies for, how they stack, and what they’re worth.

Density Bonus Programs
Height bonuses, FAR increases, and coverage exemptions tied to affordability or public benefit commitments
Fee Waivers & Reductions
Parkland dedication, impact fees, utility connection fees, and permit fee reductions
Tax Incentives
Historic preservation credits, opportunity zones, and economic development agreements
Stacking Analysis
Which programs combine, what the tradeoffs are, and the financial math

Example: A 300-unit multifamily project stacking density bonuses, fee waivers, and utility exemptions can reduce project costs by over $3 million.

Know your approval path before you start.

Every diligence report identifies the approvals your project will need — with timelines, fees, and historical success rates — so you can model the entitlement timeline before you commit.

Required Approvals

Site plan, replat, variances, conditional use permits — everything you'll need to file.

Timelines & Fees

Expected duration and cost for each approval, based on the specific pathway and decision-maker.

Risk Assessment

Historical approval rates by pathway type, so you know the odds before you file.

Complete clarity.

Every constraint is classified by severity and traced to a specific data source. You see exactly what we found, where we found it, and what it means for your project.

No Constraint
Regulatory or physical clearance confirmed. No action needed.
Moderate Constraint
Manageable with standard design or process adjustments. Requires attention in design.
Significant Constraint
Major impact on feasibility, timeline, or cost. May require variance, redesign, or deal restructuring.
Data Gap
Information not available from automated sources. Field work or agency coordination needed.
Tax Records
GIS Layers
FEMA Flood Maps
DOT Roadways
County Clerk
Permit Systems
Utility Providers
Land Dev Code

Built for the built world.

Developers & Investors

Screen sites fast. Understand constraints before committing capital.

Know what you're buying before you spend $10K finding out.

Architects

Know the regulatory envelope before shaping the design.

Setbacks, height limits, compatibility triggers, and design standards — before the first sketch.

Civil Engineering Firms

Eliminate the manual data gathering that consumes 40-50% of feasibility study effort.

Turn your $10K loss leader into a $3-5K profitable engagement.

Land Brokers

Demonstrate development potential and constraints to prospective buyers.

Add a diligence report to your listing package.

Research any site. No surprises.

Get a demo and see how a Noetic diligence report researches your property against the actual local code — with source citations and constraint severity ratings.

Get a Demo
© Noetic, Inc. 2026
LinkedIn
Built in Austin, Texas